Alloy 400/UNS N04400 Nickel Alloy Control Line with Chemical Injection Line for Oil drilling
Grade | Alloy 400/ N04400, Alloy 825/N08825, Alloy 625 /N06625, 2205, 2507, TP316/L, TP304/L, etc |
Type | Welded |
Hole count | Single/Multi Core |
Outer Diameter | 1/4“, 3/8’’, 1/2“ |
Wall Thickness | 0.035”, 0.049’’, 0.065” |
Length | According to customers’ needs, up to 10000m |
Standard | ASTM A269/A213/A789/B704/B163,etc. |
Certificate | ISO/CCS/DNV/BV/ABS, etc. |
Inspection | NDT; Hydrostatic test |
Package | Wooden or iron reel |
Application of Control Line:
1. Heat Exchanger
2 . Control line in oil and gas well
3 . Instrument tubing
4 . Chemical injection tubing line
5 . Pre-insulated tubing
6 . Electric heating or steam heating tubing line
7 . Hater tubing line
What is the control line seal?
For various reasons, many wells have a hydraulic control line extending down the casing or tubing, which is used to control valves or sleeves or other equipment.
Sometimes these control wires leak and can no longer be used, sometimes they are just no longer needed.
These control lines can extend hundreds or even thousands of meters underground.
Faulty control lines may be the source of accidental leakage. In the abandonment phase, the control line can be the source or pipeline of pressure migration.
![]() | ![]() |
An increasing number of projects in the oil service industry require the use of continuous lengths of nickel alloy chemical injection lines. They are used in a variety of applications, including chemical injection, hydraulic control, instrumentation umbilicals and flowline control. MTSCO offers products for all of these applications, helping customers reduce operating costs and improve recovery methods.
MTSCO can provide continuous tubing for nickel alloy, stainless steel and duplex chemical injection lines. Sizes, lengths, pressure levels, packaging methods, etc. can all be customized to improve your oil recovery methods and reduce operating costs.
| Terms & Conditions | Price Item | FOB, CFR, CIF or as negotiation |
| Payment | T/T, LC or as negotiation | |
| Delivery Time | 30 working days after received your deposit (Normally according to the order quantity) | |
| Package | Wooden or iron reel or as per customer’s requirement | |
| Quality Requirement | Mill Test Certificate will be supplied with shipment, Third Part Inspection is acceptable | |
| Quality | Test | NDT(Ultrasonic test, Eddy Current test) |
| Mechanical Test(Tension Test, Flaring Test, Flattening Test, Hardness Test, Hydraulic test) | ||
| Metal Test(Metallographic Analysis, Impact Test-High/low temperature) | ||
| Chemical Analysis(Photoelectric Emission Spectroscopic) | ||
| Market | Main Market | Europe, Middle East, Southeast Asia, South America. etc |


