Projet

PROJECT PROJECT End Benotzer / EPC MATERIAL FORM QTY (KG) JOER

projiect (8)

PETROBRAS Buzios P79 FPSO SAIPEM N06625 SMLS Tube

30.000

2022

projiect (9)

HALLIBURTON N08825 STRIP

13.000

2021
projiect (7)
N06625
Wärmetauscher SMLS TUBE
30.000
2021
projiect (6)
FGD SYSTEM PACKAGE FIR MOUDA STPP, STAGE II (2X660MW)
MHPS/NTPC
N10276
PIPE / FITTING / FLANGE
17.000
2020-2021
projiect (5)
p78
Petrobras
N06625
Plack / Fitting / Flange
10.000
2022-2023
rht
Ueleg Produzent KOMPLÉIEREN WELL
GBRS/WEATHERFORD
N08825
GEWICHTE RÖHR
28.000
2019
projiect (4)
CHUNBO TANK
DONGIL
N06022
PLATE/PIPE/TUBE
20.000
2019
projiect (3)
Ueleg Produzent KOMPLÉIEREN WELL
AGIP/WEATHERFORD
N08825
GEWICHTE RÖHR
42.000
2019
projiect (1)
saudi aramco(lta) FIR OFFSHORE FACILITÉITEN CRPO-87 FIR FOURZEEN JACKETS A MANIEA FIELD
Saudi Aramco
NO 4400
BLATT
65.000
2022
kuck Projet
tatneft
n08825
smls päif
150.000
2022-2023

TOP